Main Article Content

Abstract

Light Detection and Ranging (LiDAR) has in contemporary times become a popular technology in the developed world, being utilized in city planning and infrastructure development. Documentation on the knowledge of its usage in Ghana is scanty. A major challenge that hinders the effective and timely delivery of infrastructural projects in Ghana is the delay in validating certificates for payment as a result of the use of traditional methods of measurement. This paper analysed the use of LiDAR in Aboragyei dumpsite in comparison with the existing traditional method of measurement, which is both time-consuming and prone to measurement inaccuracies. The objective was to evaluate the level of accuracy in measurement between the two methods. This paper used quasi-experimental designs on LiDAR technology to capture 3D models and extract vertical and horizontal measurements from them within a short period. The findings from the comparative assessment indicated that LiDAR technology speeds up infrastructure projects by enhancing not only procedure productivity but also cross-team communication. The cloud point models generated by LiDAR mapping do not deform when confronted with angular or complex geometry, unlike theodolite. This study makes a strong case for the utilization of LiDAR as a method for measuring vertical and horizontal angles by illuminating the target with laser light and measuring each reflection with a sensor. LiDAR system if adapted for site monitoring in Ghana will help avoid distortions in measuring horizontal and vertical angles and save time. However, a major constraint using it in Ghana was the unstable weather patterns.


 

Keywords

LiDAR Site monitoring Cloud Points 3D Models

Article Details

References

  1. Bondrea, M. V. (2016). Construction survey and precision analysis using rtk technology and a total station at axis stake-out on a construction site. 16th International Multidisciplinary Scientific GeoConference SGEM2016, Informatics, Geoinformatics and Remote Sensing, 2(March). https://doi.org/10.5593/sgem2016/b22/s09.021
  2. Dib, H., Adamo-Villani, N., & Garver, S. (2013). An interactive virtual environment for teaching “triangulations and coordinates calculations” to surveying students. Proceedings of the International Conference on Information Visualisation, July, pp. 445–450. https://doi.org/10.1109/IV.2013.58
  3. Guan, S., Huang, Y., Wang, G., Sirianni, H., & Zhu, Z. (2022). An error prediction model for construction bulk measurements using a customized low-cost UAS-LIDAR system. Drones, 6(7). https://doi.org/10.3390/drones6070178
  4. He, G. B., & Li, L. L. (2020). Research and application of LiDAR technology in cadastral surveying and mapping. International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives, 43(B1), pp. 33–37. https://doi.org/10.5194/isprs-archives-XLIII-B1-2020-33-2020
  5. Kaartinen, E., Dunphy, K., & Sadhu, A. (2022). LiDAR-based structural health monitoring: applications in civil infrastructure systems. In Sensors (Vol. 22, Issue 12). https://doi.org/10.3390/s22124610
  6. Liu, Q., Duan, Q., Zhao, P., Ren, H., Duan, H., Liu, G., Wang, Z., Duan, Z., & Qin, L. (2021). Summary of calculation methods of engineering earthwork. IOP Conference Series: Earth and Environmental Science, 1802(3). https://doi.org/10.1088/1742-6596/1802/3/032002
  7. Puri, N., & Turkan, Y. (2020). Bridge construction progress monitoring using lidar and 4D design models. Automation in Construction, 109, 102961. https://doi.org/https://doi.org/10.1016/j.autcon.2019.102961
  8. Salach, A., Bakuła, K., Pilarska, M., Ostrowski, W., Górski, K., & Kurczynski, Z. (2018). Accuracy assessment of point clouds from LiDAR and dense image matching acquired using the UAV platform for DTM creation. Canadian Historical Review, 7(9). https://doi.org/10.3390/ijgi7090342
  9. Schaer, P., Skaloud, J., & Legat, K. (2012). Accuracy estimation for laser point cloud including scanning geometry accuracy estimation for laser point cloud including scanning. The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, 37(October 2014), pp. 851–856.
  10. Sharifisoraki, Z., Dey, A., Selzler, R., Amini, M., Green, J. R., Rajan, S., & Kwamena, F. A. (2023). Monitoring Critical Infrastructure Using 3D LiDAR Point Clouds. IEEE Access, 11, pp. 314–336. https://doi.org/10.1109/ACCESS.2022.3232338
  11. Srushti & Neoge. (2020). Review on LiDAR technology Srushti Neoge · Ninad Mehendale. https://ssrn.com/abstract=3604309
  12. Taheri Andani, M., Mohammed, A., Jain, A., & Ahmadian, M. (2017). Application of LIDAR technology for rail surface monitoring and quality indexing. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 232(5), pp. 1398–1406. https://doi.org/10.1177/0954409717727200
  13. Tunstel, E., Dolan, J. M., Fong, T., & Schreckenghost, D. (2009). Mobile robotic surveying performance for planetary surface site characterization. Performance Evaluation and Benchmarking of Intelligent Systems, pp. 249–268. https://doi.org/10.1007/978-1-4419-0492-8_11